Im trying to build a huge Pali, a great deal of my land isn't completely leveled.
Some of it goes down hill, others up and so forth. I was wondering do i have to completely LEVEL out all the land to build the road for the pali? Or if it has a slight incline will that work.
-
Sotsa
- Posts: 725
- Joined: Sat Mar 27, 2010 10:07 am
Re: Pali and Land
about 1 lvl down per tile has been working for me. you can go a little bit steeper with cornerposts as far as i've been able to tell.
Before you take insult to this post, keep in mind that I am simply a warrior of truth.
-
kilakan
- Posts: 408
- Joined: Sun Jun 13, 2010 2:33 am
Re: Pali and Land
If you go one tile of 'wall' per time, aka extend 1 tile, build wall unit, extend, and repeat. You can go down a lot steeper inclines, I got mine going down about 3-4 units a tile that way.
-Distant clown noises.
-
jorb
- Posts: 18715
- Joined: Fri Apr 03, 2009 7:07 am
- Location: Here, there and everywhere.
Re: Pali and Land
Oh really? That sounds unintended. Thanks.kilakan wrote:If you go one tile of 'wall' per time, aka extend 1 tile, build wall unit, extend, and repeat. You can go down a lot steeper inclines, I got mine going down about 3-4 units a tile that way.
"The psychological trials of dwellers in the last times will be equal to the physical trials of the martyrs. In order to face these trials we must be living in a different world."
-- Hieromonk Seraphim Rose
-- Hieromonk Seraphim Rose